Skip to main content
Use these definitions when reading Atlas results and configuring workforce work. Check the selected metric’s own calculation, scope, exclusions, and time basis before comparing values.

Time and scope

A forecast, actual, or staffing requirement belongs to a particular metric, work scope, interval, and timezone. Compare like scopes. Daily and weekly boundaries follow the configured timezone, including daylight saving time. A full-interval forecast and actual work observed so far are different quantities. Current intraday observations may still be provisional.

Missing values

An observed zero is a measured value. Missing history, unreadable evidence, and work still processing are separate states. Resolve the stated limitation before using a missing value as a planning input.

Avoid counting loss twice

Scheduled meals, breaks, and other nonproductive activities already reduce productive supply. Residual unplanned shrinkage represents the remaining additional loss. For example, a residual of 0.10 means a ten-percent additional loss assumption; it does not describe total shrinkage unless that is how the full calculation has been defined.

Interpret a forecast

predicted_value is the operational point returned by the method. It may differ from P50. Inspect point_statistic, the returned quantiles, interval fields, and method metadata before interpreting it as a mean or median. See forecasting for numerical examples and Resource Management for the staffing workflow.