Time and scope
A forecast, actual, or staffing requirement belongs to a particular metric, work scope, interval, and timezone. Compare like scopes. Daily and weekly boundaries follow the configured timezone, including daylight saving time. A full-interval forecast and actual work observed so far are different quantities. Current intraday observations may still be provisional.Missing values
An observed zero is a measured value. Missing history, unreadable evidence, and work still processing are separate states. Resolve the stated limitation before using a missing value as a planning input.Avoid counting loss twice
Scheduled meals, breaks, and other nonproductive activities already reduce productive supply. Residual unplanned shrinkage represents the remaining additional loss. For example, a residual of0.10 means a ten-percent additional loss assumption; it does not describe total shrinkage unless that is how the full calculation has been defined.
Interpret a forecast
predicted_value is the operational point returned by the method. It may differ from P50. Inspect point_statistic, the returned quantiles, interval fields, and method metadata before interpreting it as a mean or median.
See forecasting for numerical examples and Resource Management for the staffing workflow.